Case Studies

Case Studies

An Amelia Island Plantation homeowner chose to demolish and rebuild his home that was the end building of a five-unit complex. It would be necessary to perform an 8-foot-deep...
Six apartment buildings within the Royal Estates Apartment Complex were experiencing differential settlement, with measured movements as much as four to seven inches. The...
The owner of this 7,000 square foot home built in 1938 in Jacksonville’s historic San Marco district contacted their homeowner’s association manager reporting...
A potential buyer for this commercial property in Jacksonville’s historic San Marco district contacted Alpha Foundation Specialists to inspect the building prior to...
A relative elevation survey showed that a 9,300 square-foot residence settled differentially up to 9.5 inches toward the rear of house and up to six inches in the area of...
The Jacksonville Utilities Authority contacted Alpha Foundation Specialists regarding a high-traffic bridge that was experiencing settlement. An 8 to 12 inch void had developed...
A long strip footing was constructed on an adjacent lot approximately six feet away from the west exterior wall of the Academy Sports and Outdoors building (four feet clear...
The homeowners of this 4,000 square foot off grade house called Alpha Foundation Specialists after they began having trouble opening interior doors and noticed vertical cracks...
The Koyo Bearing Factory purchased a new 170 kip Minster machine press. The factory’s original machine press was mounted to its foundation at the existing floor slab...
Pinckney Hill Plantation had highly expansive soils and very loose soils from depths of 10' to 27' where they desired to build a 22,000 square foot residence. The access to...
Alpha Foundation Specialists, Inc. was contacted by General Contractor Ram Construction & Development to install Drive Rite 25000 Series 2-7/8” Helical Pipe Piles...
The Florida Association of Court Clerks building underwent a renovation project that included repair of drywall cracks and other distress-related issues caused by structural...
A 12 to 17-foot tall poured concrete cantilevered retaining wall provides grade separation near the property line of a U-Haul Moving and Storage facility. Over many years,...
The owners of a first floor condominium contacted the association’s maintenance personnel reporting water in two rooms of their unit. A leak detection company noted...
The second level of the Carlton Building parking garage was constructed half on grade and half above another parking lot. The area where the two halves joined had settled...
Total Case Studies: 41

our service area

We serve the following areas

FloridaGeorgia Our Locations:

Alpha Foundations
4778-B Woodlane Circle
Tallahassee, FL 32303
1-850-629-2000


Alpha Foundations
495 Grand Blvd
Ste. 206
Miramar Beach, FL 32550
1-850-344-7004


Alpha Foundations
100 N Patterson St
Valdosta, GA 31601
1-229-474-3625


Alpha Foundations
10151 Deerwood Park Blvd #250
Jacksonville, FL 32256
1-904-559-3232